I am up and back on the shovel..
Took Tuesday off work and started on the concrete, got 5 holes done. Yesterday I bunked off early , patched in a dodgy bearer and concreted 2 more holes.
Now im trying to dig out the last 2 stumps.
Guinness of a job!!
Once they are out that leaves me 4 holes to concrete and that is all the piles done, except the lean to!!!
I think i said some time back just after I started the piles, at the rate im going it will take me 2 years to get em done.
Guess I was about right! I'll have to look back and see the start date on em.
Anyhu, when they are done i will start the joists and laying the floor up to where the lean to is .
exciting stuff! This will use up the bulk of the materials from the lean to at the back of the garage and give me a large working space to get the windows in offa the deck.. also I'll be able to get rid of the pile of dunnage that was use to prop up the house.
I can then Crack on refurbing the last of the windows and doors in prep for when we have the money to rebuild the back en of the house.
Lack of money and pending shoulder surgery is gunna fuck us right up, could very well
Grind to a halt for the best part of a year..
Dam shame as with the money and a month off work I think I could get the exterior works completed and just have the fun stuff left to do.
Few pics, one of the bastard stump im working on. Most were rotted through but this one, the most difficult to access, has some meat on it and probably runs to 500 deep..
Took Tuesday off work and started on the concrete, got 5 holes done. Yesterday I bunked off early , patched in a dodgy bearer and concreted 2 more holes.
Now im trying to dig out the last 2 stumps.
Guinness of a job!!
Once they are out that leaves me 4 holes to concrete and that is all the piles done, except the lean to!!!
I think i said some time back just after I started the piles, at the rate im going it will take me 2 years to get em done.
Guess I was about right! I'll have to look back and see the start date on em.
Anyhu, when they are done i will start the joists and laying the floor up to where the lean to is .
exciting stuff! This will use up the bulk of the materials from the lean to at the back of the garage and give me a large working space to get the windows in offa the deck.. also I'll be able to get rid of the pile of dunnage that was use to prop up the house.
I can then Crack on refurbing the last of the windows and doors in prep for when we have the money to rebuild the back en of the house.
Lack of money and pending shoulder surgery is gunna fuck us right up, could very well
Grind to a halt for the best part of a year..
Dam shame as with the money and a month off work I think I could get the exterior works completed and just have the fun stuff left to do.
Few pics, one of the bastard stump im working on. Most were rotted through but this one, the most difficult to access, has some meat on it and probably runs to 500 deep..