Still in the process of giving my monster it’s new lease of life and I thought some people on here might find it interesting. I’ve reached a stage where all engine parts have removed and stripped of paint using paint stripper purchased from screwfix which has zero affect on aluminium. All seals have been removed from casing etc and await insertion of newly purchased parts. I’ve made gaskets from thick adhesive backed bead blasting mask material available from mdn in Hillington. Having access to a glass bead blaster all parts have been delicately cleaned and look absolutely amazing for an engine that covered in excess of 150k. Purchased etched primer intended for tractors and can cope with temperature to around 250 centigrade and silver/aluminium top coat. Do all my own air brush work so will post pictures of all parts soon before and after painting. Will then post picture of complete engine before insertion into frame. Also purchased a new set of Showa forks as mine pitted and got these at a bargain price and an aluminium swing arm off the monster 1000s. Brilliant condition and bead blasted the swing arm end and looks great. To my amazement the swing arm needle roller bearing tapped out easly and that after 150k and never greased. Two badly rusted but very impressed. Even after 12 winters in snow, ice etc the exhaust came up a treat and will post pictures.
Note: regarding engine
Good points
1 zero movement in crank bits and bobs.
2 very small section of carbon on piston crowns
3 perfect condition of Nicosol coated cylinders
4 small amount of carbon on valve heads
Bad but expected
1 two new exhaust valves and seats.
2 new exhaust rocker with worn face.
Needs reshimed but very pleased with engine after such a mileage.
Fuel injection
1 Throttle bodies completely dismantled, injectors cleaned and spray pattern checked.
2 Ultrasonically cleaned in my new tank.
3 All hoses replaced with biofuel hoses compatible with 100 % ethanol etc and single ear clips used from Sealey. A box of 160 variable size stainless clips for £25.
4 All nyloc fasteners replaced with the preferable staytite range which can reused on engines unlike nyloc.
5 A very important area sometimes missed is removing the butterflies. The seals on either side perish and I’ve replaced with Viton seals available from California cycle works.
Tank.
1 Slight expansion of around 3mm on right hand side. No big deal after 150k
2 Perfect inside almost like it had left the factory with zero build up of anything around the fuel pump etc. Changed filter anyway.
Wheels.
Presently removing thev couche drives, bearing etc and get them stripped and powder coated next week hopefully.
All rusted parts now removed and cleaned of rust and taking them to merlin platers in Newhouse next week. Will also include rusted parts from 1098.
Will update with pictures as she develops.
Note: regarding engine
Good points
1 zero movement in crank bits and bobs.
2 very small section of carbon on piston crowns
3 perfect condition of Nicosol coated cylinders
4 small amount of carbon on valve heads
Bad but expected
1 two new exhaust valves and seats.
2 new exhaust rocker with worn face.
Needs reshimed but very pleased with engine after such a mileage.
Fuel injection
1 Throttle bodies completely dismantled, injectors cleaned and spray pattern checked.
2 Ultrasonically cleaned in my new tank.
3 All hoses replaced with biofuel hoses compatible with 100 % ethanol etc and single ear clips used from Sealey. A box of 160 variable size stainless clips for £25.
4 All nyloc fasteners replaced with the preferable staytite range which can reused on engines unlike nyloc.
5 A very important area sometimes missed is removing the butterflies. The seals on either side perish and I’ve replaced with Viton seals available from California cycle works.
Tank.
1 Slight expansion of around 3mm on right hand side. No big deal after 150k
2 Perfect inside almost like it had left the factory with zero build up of anything around the fuel pump etc. Changed filter anyway.
Wheels.
Presently removing thev couche drives, bearing etc and get them stripped and powder coated next week hopefully.
All rusted parts now removed and cleaned of rust and taking them to merlin platers in Newhouse next week. Will also include rusted parts from 1098.
Will update with pictures as she develops.

