Another big day yesterday. I blew out the roofing job for the day coz the fella pissed me off with his tude..
Anyhu, with all the cladding stripped, I wanted it gone and also the pole from the back garden. What a shit job at 7.30 in the morning, digging out the pole was...
I nearly gave up, but as I was going to the scrappy it had to be done.
Anyhu got it done, cut the concrete off it and then loaded all the cladding and took it to the scrap yard.
When I was unloading it, I realized I'd left the fuckn pole behind!
Not that it would have made much difference to the tally!!!
I was told I'd get 12 cents a kilo but they only gave me 5 cents a kilo!!!!!
So 240 kg netted me a massive $12.00!!!
Not even enough for a coffee and a toastie, I had to use my card as that came to $13.50..
Still better to get paid than pay 27 cents a kg to dump it!
The scrappy is just over the road from where I get sand so I grabbed. 25 of a cube and went home to start on bricks.
It was 11.00 am by then but I didn't lay a brick till I got set up , cut down 40 odd bricks and set out the profiles. It was 2.30 by that time
Got 2/3rds of the first corse of bricks down by 4.30.
Then B got home with beer so it took a bit longer to do the last 3rd.
By the time I was done and cleaned all the gear, it was 8pm!
Then I had to cook lamb chops...
Good day and at least the pile of scrap is offa the lawn!
Anyhu, with all the cladding stripped, I wanted it gone and also the pole from the back garden. What a shit job at 7.30 in the morning, digging out the pole was...
I nearly gave up, but as I was going to the scrappy it had to be done.
Anyhu got it done, cut the concrete off it and then loaded all the cladding and took it to the scrap yard.
When I was unloading it, I realized I'd left the fuckn pole behind!
Not that it would have made much difference to the tally!!!
I was told I'd get 12 cents a kilo but they only gave me 5 cents a kilo!!!!!
So 240 kg netted me a massive $12.00!!!
Not even enough for a coffee and a toastie, I had to use my card as that came to $13.50..
Still better to get paid than pay 27 cents a kg to dump it!
The scrappy is just over the road from where I get sand so I grabbed. 25 of a cube and went home to start on bricks.
It was 11.00 am by then but I didn't lay a brick till I got set up , cut down 40 odd bricks and set out the profiles. It was 2.30 by that time
Got 2/3rds of the first corse of bricks down by 4.30.
Then B got home with beer so it took a bit longer to do the last 3rd.
By the time I was done and cleaned all the gear, it was 8pm!
Then I had to cook lamb chops...
Good day and at least the pile of scrap is offa the lawn!